PROJECTS DONE IN 2008
NEW CONCRETE DRIVEWAY AUGUST 2008


^Bo getting ready to remove some rock and grass.

^We are having Bo add concrete in front of our new shed.
He ended up pouring it with a slight ramp so that we can just drive right on in.


^Bo ended up moving all the rock from the high spots to the lower areas
so we did not have to purchase any rock. Lucky us

^So here is where we skip ahead.
Jeff and I planned it so well (total coincidence) that the forms were put in place on 8-1-08
and the concrete was poured the day we left for Arkansas 8-2-08.
The good thing was that when we arrived home on 8-9-08 the concrete was set and ready to drive on

^LOVE IT. I cant believe we lived here for 11 years and had not done this sooner.


^Both our cars fit perfectly at the top with plenty of room to walk around them.
When Jim and Cindy were down with their camper they backed it up to the shed
we still could get my mustang out of the spot it is parked in with no problems.


NEW GARAGE ROOF MAY 2008


^Yeap, You guessed it another project for the Klein family.

^I think Jonathan really liked the dumpster in the drive.I did to.
I got to get rid of a lot of junk that was just taking up space in the house, basement and garage

^Yes that is Jeff and Jessica on the garage roof.
Jessica is fearless when it comes to heights

^Poor Jeff he did a lot of the work himself until my brother Ron and our neighbor Jim came to help
Jessica had soccer that weekend with two games both days.

NEW BATHROOM COLOR


^After many years of boring white walls I finally painted the bathroom.
Here is the before paint picture

^Taping the walls off was the worst part.
The color is a greyish green

^Finished wall color.Hard to get a good shot of the color but the picture below is closer
I still have to paint the ceiling.

^Love the color. White is just to boring
Back to main page